Tessera is Forbo's carpet tile range and it's a proper workhorse. Forbo's own guide is one of the most thorough out there — here's the short, useful version.

Difficulty
Easy
Time
3–5 hours for a 20m² room
People
1 person
Skill level
Beginner friendly

What you’ll need to fit Forbo Tessera carpet tiles

  • Carpet tile tackifier and a lambswool roller or brush
  • Sharp utility knife and spare blades
  • Metal straight edge
  • Tape measure and chalk line
  • Knee pads

Before you start

Check the batch twice

Forbo print the batch number on the packaging AND on the back of every tile. Different batches will show as a shade difference, so check before you start. Order spares from the same batch at the same time.

24 hours in opened boxes

Leave the tiles in the room in opened boxes, stacked no more than six boxes high. Make it 48 hours if they've been somewhere cold.

Warm the room

18–27°C for 48 hours before, all the way through, and for 24 hours after.

Get the floor smooth

Clean, dry and flat. Old PVC floors must come up. Wood block floors are best removed.

How to fit Forbo Tessera carpet tiles, step by step

  1. Find the centre of the room

    Start as close to the centre of the room as you can, and set your lines so you avoid small cuts both at the edges and in the field. Chalk a cross and check it's square.

  2. Dry-lay a row first

    Before any adhesive goes down, lay a loose row of tiles out to each wall. If the edge tiles would come out as thin slivers, shift your centre line over by half a tile.

  3. Fix the tiles down

    Roll the tackifier on with a lambswool roller or brush. Then wait about an hour — it must go clear and tacky before tiles go down. If your floor is very absorbent, prime it first or it'll drink the tackifier.

  4. Check which way the tiles go

    The arrows on the back show pile direction. If you're laying all one way, Forbo suggest pointing the arrows towards the main window. Tessera supports tessellated (quarter turn), brick, quarter brick, monolithic and half drop.

  5. Work outwards from the middle

    Start at the centre and build out in a staircase shape rather than straight rows. It keeps everything square and stops small errors adding up across the room.

  6. Butt them up gently

    Tiles should touch with no gap, but don't force them tight. Brush the pile back as you lay each one so nothing gets trapped in the joint.

  7. Cut the edge tiles

    Put the tile you're cutting face down on top of the last full tile, then put a third tile on top pushed against the skirting. Mark along its edge, cut through the back with a sharp knife, and fit it with the cut edge to the wall.

  8. Don't force perimeter tiles

    Forbo are clear that a cut tile pushed in under pressure will lift later. It should sit in comfortably, not be wedged.

  9. Finish off

    Fit a threshold strip in any doorway, vacuum the floor and put the furniture back. Carpet tiles can be walked on straight away.

Watch it being done

Installing Tessera carpet tiles — Forbo's own UK installation video.

The Forbo Tessera bits that catch people out

Microtuft goes quarter turn

If you've bought one of the Microtuft ranges, Forbo recommend laying it quarter turn rather than all one direction. It keeps loose fibres at the tile edges from showing.

Softbac tiles: place, don't slide

The cushion-backed Softbac ranges must be placed firmly against their neighbour, never slid or forced. They spring back and you get gaps.

Plank layouts are more adventurous

Tessera planks can be laid monolithic, herringbone, double herringbone, half drop brick or weave.

Shedding is normal

New cut pile sheds a little fibre. Forbo say it's not a fault and it stops after a few vacuums. The pile can take up to six weeks to fully recover from being boxed.

Mistakes to avoid

  • Not checking the batch number on the tile backs as well as the boxes.
  • Laying before the tackifier has gone clear.
  • Forcing perimeter tiles into place under pressure.
  • Sliding Softbac cushion-backed tiles instead of placing them.
  • Using sticky protective sheeting afterwards — it can leave residue Forbo won't cover.

Forbo Tessera fitting questions, answered

What adhesive do Forbo Tessera tiles need?

A tackifier rolled over the floor and left to dry clear and tacky — usually about an hour. Perimeter tiles that aren't held by anything, and stair treads and risers, get a permanent adhesive instead.

Which way do Tessera tiles go?

Follow the arrows on the back. If you're laying them all one direction, point the arrows towards the main light source in the room.

Why are my new Tessera tiles shedding fibres?

That's normal on cut pile products and it stops after a few vacuum cycles. It's not a manufacturing fault.

Can Tessera go over underfloor heating?

Yes, as long as the surface stays at or below 27°C. Bear in mind carpet insulates, so the heating will feel less effective than under a hard floor.

Do I need to prime the floor first?

If it's very absorbent or dusty, yes — otherwise it'll soak up the tackifier before it can do its job.

Rather someone else did it?

If it's a big room, an awkward shape, or you just fancy a Saturday off, our own fitting teams cover the whole of the UK. Free site survey, tidy job, no dramas.

See how our fitting works

Nationwide fitting, fully managed

Our own teams, a free site survey, and one point of contact from quote to clean-up.

Get a fitting quote

Manufacturer’s own instructions: Forbo Tessera downloads. Always check the guidance supplied in the box — ranges and backings vary.