Flooring installation: Aston Bond LLP – Headquarters

Slough, Berkshire

We transformed the ground floor office at Aston Bond LLP's Slough headquarters with a striking multi-colourway carpet tile installation. Using the Mohawk Art Intervention – Creative Spark collection across 190m², our team delivered a design lay installation that brought colour, character and professionalism to this award-winning law firm's workspace.

Aston Bond LLP is one of the Thames Valley's most established and respected law firms — Legal 500-recognised, award-winning, and with a growing presence across Berkshire and beyond. When the firm undertook a refurbishment of the ground floor office at their Slough headquarters, they came to us to deliver the commercial flooring across the open-plan desk areas.

What made this project particularly smooth was the pre-installation process. Rather than requiring a site survey, Stephen simply sent us a detailed floorplan — from which we were able to accurately quantify materials and plan the installation in full, moving quickly from enquiry to completion.

The product: Mohawk Art Intervention – Creative Spark

We specified the Mohawk Art Intervention – Creative Spark carpet tile collection across four carefully selected colourways, covering 190m²:

  • Creative Spark 646 (dark green) — 140m²
  • Creative Spark 621 (light green) — 35m²
  • Creative Spark 363 (red) — 25m²
  • Creative Spark 362 (orange) — 20m²

The installation

Our specialist fitter carried out a Design Lay installation over two days — 26th and 27th January 2026 — along with a full uplift and disposal of the existing floor covering. Bostik FIX A320 Tack adhesive and Sticky Stuff tackifier spray were used throughout, with materials delivered to site 48 hours in advance. The project was completed on time and signed off with the space fully handed back to the Aston Bond team.